
Peter Symonds College Music Block
Client
Peter Symonds College
Form of Contract
JCT Design & Build
Duration
56 Weeks
Architect
TKLS Architects
Stride Treglown
M&E Consultant
Subcontract
Ascia has now completed the demolition of the existing Wyke Building and the design & build of the new music block at Peter Symonds College, plus external works comprising new external steps, ramps and retaining walls, extended footpaths and pedestrian access routes, and the relocation of the existing cycle store.
The building contains the UK’s first state educator acquired Steinway Spirio piano as well as state of the art teaching, recording and studio equipment. Facilities which demonstrate the colleges commitment to provide an incredible platform for music education and performance.
There is also new drainage including a soakaway within the existing car parking area and remedial works to the existing drainage systems all of which was undertaken during college holidays to minimise disruption as the car park and bus routes must remain operational during term time.
Built to BREAAM Excellent standards.