02392 006 344 info@asciaconstruction.co.uk
Ascia Construction
  • Home
  • About
    • Ascia Construction
    • Meet The Team
    • Values
    • Certifications
  • Sectors
    • Commercial, Industrial & Defence
    • Health, Community & Blue Light
    • Education
    • Leisure & Retail
    • Refurbishment & Heritage
    • Residential
  • News
  • Social Values
  • Contact
Select Page
Banner 4 - Ascia Construction

Itchen College

Client

Itchen College

Form of Contract

JCT Design & Build

Duration

14 Weeks

Architect

Architecture PLB

M&E Consultant

Subcontract

The extension, remodelling and refurbishment of the existing first floor library, adjoining offices and circulation spaces.

Providing Student Services offices and meeting spaces adjoining and linked to the library, creating more visible and accessible support facilities for the students.

The majority of the works were carried out over the summer holiday period.

courtyard surrounded by new college buildings
college study area with chairs and tables
school corridor area
classroom with chairs and tables
school corridor
new college buildings with plants outside
Education
  • All
  • Projects Education
Falklands Primary School

Falklands Primary School

HSDC Havant Facade

HSDC Havant Facade

Fareham College

Fareham College

Andover College

Andover College

St Edmund’s Catholic School

St Edmund’s Catholic School

Oasis Academy

Oasis Academy

HSDC, Havant Campus

HSDC, Havant Campus

Peter Symonds College

Peter Symonds College

Sparsholt College HE Centre

Sparsholt College HE Centre

Whitehouse Primary School

Whitehouse Primary School

Itchen College East Block

Itchen College East Block

CEMAST Extension

CEMAST Extension

Brockenhurst College

Brockenhurst College

Peter Symonds College

Peter Symonds College

UoC Sports Dome

UoC Sports Dome

Sherfield School

Sherfield School

Itchen College South Block

Itchen College South Block

UoC Health Sciences

UoC Health Sciences

Fareham College T Levels

Fareham College T Levels

St. Andrews CE High School

St. Andrews CE High School

BPC Rose Theatre

BPC Rose Theatre

The Loddon School

The Loddon School

Nyewood CE Junior School

Nyewood CE Junior School

Trinity School

Trinity School

Ludgrove School

Ludgrove School

BPC Science Block

BPC Science Block

St. Bartholomew’s

St. Bartholomew’s

LWC Headmasters House

LWC Headmasters House

Seaford College

Seaford College

BPC Social Spaces

BPC Social Spaces

BPC Rose Cafe

BPC Rose Cafe

LWC Gavin Hall Theatre

LWC Gavin Hall Theatre

BPC Mountbatten Building

BPC Mountbatten Building

Sparsholt College Dining Hall

Sparsholt College Dining Hall

LWC Errington Block

LWC Errington Block

LWC Health Centre

LWC Health Centre

Privacy Policy & Terms of Use

Modern Slavery & Human Trafficking Policy Statement

Ascia PPN 06/21 Carbon Reduction Plan Sustainability Report 2025

ADDRESS

The Portico, Stansted House, Stansted Park, Rowlands Castle, Hampshire PO9 6DX

CONTACT

02392 006 344

info@asciaconstruction.co.uk

© All Rights reserved with Ascia Construction Ltd | Designed and developed by Eon Graphics