Fareham College Re-roof
Client
South Hampshire College Group
Form of Contract
JCT Design & Build
Duration
25 Weeks
Architect
Architecture PLB
Engineer
Andrew Waring Associates
M&E Consultant
Subcontract
Ascia has completed works at Fareham College Campus, successfully delivering the design and construction of the C Block roof replacement.
The project was carried out within a live campus environment while the building remained fully operational.
Prior to commencement, Ascia collaborated with the design team to identify a solution that allowed construction to proceed without disrupting operations. An overclad system was selected to ensure the building remained functional throughout the project.
Education