Fareham College Re-roof

Client

South Hampshire College Group

Form of Contract

JCT Design & Build

Duration

25 Weeks

Architect

Architecture PLB

Engineer

Andrew Waring Associates

M&E Consultant

Subcontract

Ascia is currently on-site at Fareham College Campus, completing the design and construction of the C Block roof replacement.

The project is being carried out in a live campus environment while the building remains in use.

Prior to commencement, Ascia collaborated with the design team to identify a solution that would allow construction to proceed without disrupting operations. An overclad system was selected to ensure the building remains functional throughout the project.