The Carville Building, Peter Symonds College
Client
Peter Symonds College
Form of Contract
JCT Design & Build
Duration
36 Weeks
Architect
Stride Treglown
Engineer
Paul Basham Associates
M&E Consultant
Subcontract Design
The design and build of a two-storey BREEAM Excellent 12 classroom state-of-the-art teaching block.
Consisting of timber framed SIP’s construction with incorporated glulam columns, with an outer skin of masonry, external powder coated aluminium windows & doors with Brise Soleil wing blades.
Works were carried out within the live campus.
Education