Fareham College T Levels 2021
Client
Fareham College
Form of Contract
JCT Design & Build
Duration
8 Weeks
Architect
Cover Storey Architects
M&E Consultant
Subcontract Design
Design and build of refurbishment works to D Building to deliver the Health and Sciences T Levels.
Works include mock wards and consultation rooms as well as teaching areas. Including minor tap upgrades to two science labs in the College’s B Building.
Education