Northington Road, Itchen Abbas

Client

The Trustees of Lord Ashburton’s 1963 Settlement

Form of Contract

JCT Design & Build Contract

Duration

48 Weeks

Architect

Cover Storey Architects

Engineer

Andrew Waring Associates 

The conversion of a dilapidated barn to form two domestic dwellings on the outskirts of the rural village Itchen Abbas. The feature timber roof trusses were retained and reinforced whilst the rest of the building fabric was removed and replaced. 

Ascia worked closely with the client to value engineer areas of the original project brief, to provide high quality finishes at a lower cost where possible. Although this was a fairly rural site Ascia needed to ensure that the public right of way was maintained across the site throughout the project.

Residential