Stansted Park Farm Shop, Rowlands Castle
Client
The Stansted Park Foundation
Form of Contract
JCT Building Contract with Contractors Design
Duration
30 Weeks
Architect
Johanna Jefferson Architects
Engineer
Archibald Shaw
M&E Consultant
Creation of a new build farm shop within a busy existing garden centre. Constructed using a mixture of traditional and modern materials, including a Douglas Fir timber frame from Stansted’s own forest, steel frame and mezzanine floor, handmade bricks with lime mortar and slate roof tiles. Having been consulted regarding the design early in the project, Ascia were able to manage the process so that the structural and architectural elements of the build met seamlessly without compromise.