LCT7074, The D-Day Story
Client
The National Museum of the Royal Navy
Form of Contract
JCT Intermediate Building Contract with Contrators Design
Duration
48 Weeks
Architect
Pritchard Architecture
Engineer
Mann Williams
M&E Consultant
Chapman BDSP
Construction of cantilevered canopy and basin for the refurbished 200-foot long D-Day landing craft tank (LCT 7074) to be sited outside the D-Day Story in Southsea.
Ascia worked with the client and architect, and offered over £300k of value engineering to make the project viable and in budget.
Leisure & Retail