Barton Peveril College, Mountbatten Building, Eastleigh

Client

Barton Peveril College

Form of Contract

JCT Building Contract 

Duration

15 Weeks

Architect

HNW Architects

M&E Consultant

Ramboll 

A design and build project provided the College with 11 new, bright and vibrant English classrooms. Consisting of the remodelling of the entire third floor of the central Mountbatten Building and removing existing science laboratories.

Ascia understood the challenge that a fast-paced project would bring, within an occupied building.  Through detailed planning and constant communication Ascia were able to safely manage shared access routes with students and carry out works during an exam period to provide the college with new robust classroom space. The project was delivered one week ahead of schedule.

Education